Logistics software requirements checklist
A 28-item checklist for logistics software requirements covering scope, data, integrations, scanning, reporting, security and acceptance, to tick and export.
Get requirements written
Checklist
A requirements document can look complete and still leave open the questions that cause trouble later: who owns the item master, what the scanner does when it loses signal in the freezer, who signs off. This checklist holds 28 items in seven sections that requirements for tracking or inventory software should answer before anyone builds, configures or buys.
How to use the checklist
- Work through it with the requirements in front of you, or with your notes if there is no document yet.
- Tick an item only when the answer is written down and agreed. “We know that” is not a tick.
- Turn every unticked item into an open question with an owner and a date.
- Download the CSV before you close the page, since ticks are not saved. Filter on “No” in the Confirmed column and use that list as the agenda for the next session.
- Run it again before build starts and before any vendor demonstration.
What good looks like, section by section
Scope and process
The process is written from the first step to the last, and each step names who does it, where and with what device. Volumes are recorded for an ordinary day and a peak day, in orders, lines, receipts, shipments and scans. Exceptions such as short shipments, damaged cartons and unlabeled pallets are listed with how they are handled today. Out-of-scope processes are written down, so nobody assumes them later.
Data
Each record the system keeps is named: item, location, lot, shipment, order. For every master data field there is one agreed system of record. Units of measure and conversions (each, inner pack, case, pallet) are documented. Lot, serial and expiry needs are stated. Historical data to migrate is listed, with a cutoff date.
Integrations
Every interface is listed with its direction, trigger and owner; the integration inventory worksheet is built for this. Trading partner requirements are collected, including the X12 transaction sets and versions each partner uses (for example 856 Ship Notice/Manifest) and their label formats. Error handling and retries are defined, and test environments and sample files exist for each partner.
Scanning, labels and devices
Barcode symbologies and label layouts are specified. If your retail customers are preparing for GS1 US Sunrise 2027, the move toward 2D barcodes at retail point of sale, say whether your labels and scanners need to handle 2D codes. Devices, operating systems and connectivity are known for each area, offline behavior is defined for dead spots, and printers are listed by location and model.
Reporting and alerts
Each report names its audience, how often it runs and the decision it supports. Alerts are written as conditions with an owner, in the style of the tracking milestone map. Audit trail needs are stated: who changed what, and when.
Security and operations
User roles and permissions are listed. Single sign-on and identity provider needs are stated. Backup, retention and recovery expectations are defined. Who supports the system after go-live is decided before build, not after.
Acceptance
Each requirement has a test that shows it works; the UAT test plan template holds them. A sign-off owner is named for each area, and go-live criteria are agreed before build starts.
Who should fill it in
- A process owner for each area (receiving, inventory, shipping) who can settle disagreements about how work should be done.
- The IT lead, for data, integrations, devices and security.
- Someone from finance for reports, costing and audit needs.
- Floor leads, who review scope, exceptions and devices against how work really happens.
- A facilitator who keeps the answers written down and the open questions moving.
When the checklist is not enough
A checklist tells you what is missing, not what the answers are. Finding them takes time on the floor, interviews and sample documents. Our requirements analysis service produces the full document: a process map, an integration inventory and numbered requirements with acceptance tests. Project planning then turns them into a dated plan.