GenFrontier homeScope a project
Menu
Filed under
Deliver toOperations and IT leads starting a tracking or inventory project

Requirements analysis for logistics software

Before anyone writes code or signs a license, we write down how your operation actually works and what the software must do, with a test for each requirement.

Scope a project
services / requirements-analysis
A triangular architect's scale ruler across a blank gridded blueprint, with a red pencil beside a short red line it has just drawn

Most logistics software projects that go wrong were not lost in the code. They were lost earlier, when “track inbound shipments” meant one thing to the receiving lead, another to purchasing and a third to the developer. Requirements analysis is the work of turning those different pictures into one written description that everyone signs, and that a tester can check.

What we look at

We start on the floor or on a video walk, not in a conference room. A requirements session that skips the dock misses the work-arounds that keep the operation running: the whiteboard of expected trucks, the spreadsheet of short shipments, the receiver who knows which supplier’s labels never scan.

During the walk and the interviews that follow, we collect:

  • The process, step by step. Who does each step, where, with what device, and what they record.
  • Volumes. An ordinary day and a peak day, in orders, lines, receipts, shipments and scans.
  • Exceptions. Short shipments, damaged cartons, unlabeled pallets, late carriers, cancelled orders, and how each is handled today.
  • Documents and data. Sample purchase orders, advance ship notices, labels, bills of lading and inventory exports, plus the systems that produce them.
  • Interfaces. Every place data moves between your ERP, WMS, TMS, carriers and trading partners, including the ones done by hand.

What you receive

The output is a requirements document your team can read without a glossary. It has three parts.

A process map of the current state, with the pain points marked where they occur. Where the future process differs, we draw it too, so the change is visible before it is built.

An integration inventory that lists each interface with its direction, trigger, data, method (EDI, API, file or manual), volume and owner. For EDI partners it records the transaction sets involved, such as the 856 ship notice or the 940 warehouse shipping order, and where partner specifications still need to be collected. You can start one yourself with our integration inventory worksheet.

Numbered requirements with acceptance tests. Each requirement is a single statement of what the system must do, written so that it can pass or fail. “Receiving shows expected shipments” becomes “When an ASN arrives for an open purchase order, the expected receipt appears on the receiving screen within five minutes, with the SSCC of each pallet.” The acceptance test names the data and the expected result.

Example (fictional). A distributor asks for “better cycle counting”. The requirements session finds that counts are accurate but adjustments post days later, so the system shows stock that was already found missing. The written requirement becomes: “An approved count variance posts to the inventory record within 15 minutes of supervisor approval.” The acceptance test counts a bin with a known variance, approves it and checks the on-hand balance before and after.

How it fits the rest of a project

Requirements analysis is the first phase of most engagements and can be bought on its own. The document is yours, and it is written so you can use it with any vendor: to build with us, to brief another developer, or to evaluate a packaged product against your process rather than a demo script.

When the requirements are signed, project planning turns them into a dated plan with owners, test windows and a cutover date. If you are comparing software rather than building, the requirements become the scoring sheet for vendor demonstrations.

What we need from you

  • A process owner who can settle disagreements about how work should be done.
  • Time from the people who do the work: usually a half-day walk and two review sessions per area.
  • Sample documents and exports, with sensitive fields removed where needed.
  • An IT contact who knows the systems and interfaces.

Questions to answer before you start

You can work through these on your own with the software requirements checklist:

  1. Which process steps are in scope, and which are explicitly out?
  2. What is the system of record for each piece of master data: items, units of measure, locations, customers, carriers?
  3. Which trading partners impose requirements, such as label formats, EDI versions or delivery windows?
  4. What does a peak day look like, and when is the next one?
  5. Who signs off each area, and what would make them say no?

Scope your project.

Tell us what you need to track, which systems you run and when it has to work. We reply with questions or a time to talk.