GenFrontier homeScope a project
Menu
Filed under
Deliver toOperations managers, shift supervisors and trainers preparing a team for go-live

Onboarding and training on real devices

Each role trained on its own devices and screens with realistic data, a super-user on every shift, and people on hand after go-live until the questions slow down.

Scope a project
services / onboarding-training
A child's red bicycle with small training wheels leaning against a short stack of cardboard cartons

People learn a new receiving screen by receiving, not by watching slides in a break room. We train each role on the devices and screens it will use, with data that looks like your own, and we stay close after go-live until the questions slow down. Training is a named deliverable in the statement of work, with a session plan, an attendance record and a practical check for every person, not an optional extra.

Training by role

Nobody needs to learn the whole system. We build a training matrix from the requirements and the documentation: each role, the tasks it performs and the session that covers them. Sessions are short, held during the shift where possible, and use the role’s own guide and reference card.

Role The session covers Ready when they can
Receiver Receiving against a ship notice, receipts without one, damages, relabeling Receive three test shipments, one with an exception, without help
Put-away and replenishment driver Put-away scans, location confirmation, moves Put away and move stock with every location confirmed by scan
Inventory controller Cycle counts, recounts, adjustments and approvals Run a count with a variance through to an approved adjustment
Customer service Shipment status lookups, exception queues Answer a “where is my order” call from the screen alone
Supervisor Queues, reports, approvals, shift handover Clear the exception queue and explain each reason code
Administrator Users, settings, label templates, interface monitoring Add a user, change a label and replay a failed message

On real devices

Training happens on the handhelds, printers and label stock you will use at go-live, at the stations where the work happens whenever the operation allows. If the freezer team wears gloves, they train in gloves. If a dock door has weak Wi-Fi, people learn what the screen does when the connection drops and what to do next. Problems found here are much cheaper to fix than problems found on the first live morning.

A training environment with realistic data

We never train in production. A separate training environment is loaded with your items, locations, carriers and partners, plus fictional but realistic orders, ship notices and exceptions: a short shipment, a missing label, an item with two units of measure. The environment is reset between sessions, and each session follows a scenario script, so every receiver practices the same difficult cases.

Train-the-trainer and super-users per shift

Before general training, we choose and train super-users with your managers: at least one per shift and per site, people their colleagues already ask for help. They are trained first and deeper, help test the documentation, co-run the sessions for their own shift, and are the first line of help during hypercare. This is how the night shift, the weekend crew and next year’s new hires get trained after we have gone. Super-users also get a trainer pack: the session plans, scenario scripts and the practical checks.

Example (fictional). A distributor runs two shifts and a weekend crew. It names three super-users, one per crew. They train a week before everyone else, rehearse each scenario twice, and then run the receiving sessions for their own crews with a GenFrontier trainer beside them. On go-live night, the second-shift super-user handles a pallet of item EX-20118 that arrives with no SSCC label, using the relabeling steps from her reference card.

Readiness checks

Before go-live, every user completes the practical check for their role, and the results go into a readiness list by person, role and shift. Training completion sits alongside devices, data, interfaces and support in the go-live readiness checklist. If a role is not ready, that is a go/no-go input for the sponsor, not something to discover on the first morning.

Hypercare after go-live

Hypercare is the period right after go-live when the project team stays close to the floor. Its length and hours are set in the project plan. During hypercare:

  • Our people are on site or on call during the agreed shifts.
  • A short check-in at each shift start reviews yesterday’s issues.
  • Every issue goes into one log with a severity, an owner and a status.
  • Quick fixes to settings, labels and documents are made and recorded.
  • Guides and reference cards are updated where users stumbled.

Hypercare ends against criteria agreed in advance: open issues below an agreed level, transactions flowing through every interface, and count variances within tolerance.

Support handover

At the end of hypercare, we hand over to whoever supports the system next: your own IT team, a super-user group, or GenFrontier under a Support after go-live engagement described on our engagements page. The handover includes the issue log with open and closed items, known issues and their work-arounds, the integration runbook, the training materials and a contact and escalation list. Response terms, if you choose support from us, are agreed in that support agreement.

For systems you already own

Training does not need a new system. If your team runs a WMS or ERP that people were never properly trained on, the Documentation and onboarding engagement covers it: we document the system as configured, train each role on it, and set up super-users so the knowledge stays.

Scope your project.

Tell us what you need to track, which systems you run and when it has to work. We reply with questions or a time to talk.