GenFrontier homeScope a project
Menu
Filed under
Deliver toOperations, purchasing and IT leads at wholesale distributors

Receiving, inventory and EDI software for distributors

A distributor's margin depends on records that agree with each other: what the supplier said it shipped, what you received, what is in the bin and what you told the customer.

Scope your receiving and EDI work
solutions / wholesale-distribution
A tall stepped pyramid of identical cartons with one red carton being slid out of the middle while the stack stays level

A distributor sits between two sets of trading partners. Suppliers send ship notices and invoices. Customers send purchase orders and expect ship notices back, often as EDI on both sides. The ERP holds the orders and the money. A WMS, or the ERP’s warehouse module, holds the bins. The trouble tends to sit in the handoffs: receipts keyed from a packing slip, counts that never post, a retail customer’s requirements kept in someone’s inbox. We build the missing tracking and inventory pieces around the systems you already run, and connect them through ERP and WMS integration.

Receiving against the supplier’s ASN

The X12 856 Ship Notice/Manifest tells you what a supplier says it shipped, often down to the pallet and carton, with a license plate ID such as an SSCC on each label. When the ASN arrives before the truck, receiving becomes a check instead of a typing job: scan the pallet label, confirm the contents, record the difference.

What we typically build:

  • An expected-receipts view from open purchase orders and incoming ASNs, sorted by dock date and appointment.
  • Scan-to-receive against the ASN, with exceptions for over, short, damaged and unexpected items, each with a reason code and a photo where it helps.
  • A receiving record per supplier: ASNs that arrived before the truck, lines that matched, labels that would not scan. Purchasing gets facts for the next vendor review instead of anecdotes.
  • Blind receiving for suppliers that send no ASN, so the count is not copied from the paperwork.

Inventory accuracy and cycle counting

ASCM defines inventory accuracy as the on-hand quantity being within an allowed tolerance of the recorded balance. It is usually measured as the percent of items within tolerance, with targets that usually run from 95 to 99 percent depending on the value of the item. Cycle counting counts stock on a schedule instead of once a year, and in ASCM’s words its key purpose is “to identify items in error, thus triggering research, identification, and elimination of the cause of the errors.”

For most distributors the counting is not the hard part. The hard part is what happens after the count. We build:

  • A count program by class, with high-value and fast-moving items counted more often and tolerances set by item value. The cycle count planner shows the daily workload before you commit to it.
  • Blind count tasks on handhelds, so the counter does not see the expected quantity.
  • A variance approval step with a posting rule, so an approved adjustment reaches the on-hand balance within minutes, not at the end of the week.
  • Root-cause codes on every adjustment, so the same bin does not fail every month. The inventory accuracy calculator measures the result the way ASCM defines it.

Customer EDI

Set X12 name What it does for a distributor
850 Purchase Order The customer’s order, which becomes your sales order
856 Ship Notice/Manifest Your ASN to the customer, with pallet and carton detail
810 Invoice The invoice for what actually shipped
846 Inventory Inquiry/Advice Stock levels you share with a customer, or receive from a supplier
753 / 754 Request for Routing Instructions / Routing Instructions Asking a retail customer how to route a shipment, and the answer
997 Functional Acknowledgment Confirms that a document arrived

The EDI translator handles the format. The harder part is the data behind each document. An 856 with pallet and carton detail is only right if the cartons were scanned onto the pallets that actually shipped. An 810 is only right if it bills what the 856 said. We build the pack-and-ship scanning that produces that hierarchy and the interface that sends it, and we collect each trading partner’s implementation guide during requirements analysis.

Retail routing and compliance requirements

Large retail customers publish vendor requirements. These typically cover label format and placement, when the ASN must arrive relative to the shipment, how cartons may be packed and mixed, delivery appointments and windows, and how to request routing. Missing them usually leads to deductions under that customer’s own terms, which vary by customer and by agreement.

We turn each customer’s guide into rules the system can check: which label to print, which routing request applies, when the ASN must go, which cartons need extra marking. The checks run at pack-out, so a shipment that breaks a rule is held at the dock instead of being found on a deduction report weeks later. Label layouts and printing are covered under barcode and RFID labeling.

Branch and DC transfers

Distributors with more than one location move stock between them, and a transfer is where stock goes missing in plain sight. It has left the DC but has not been received at the branch, so it sits in neither bin. We build transfer orders with an in-transit status, scan-out at the sending site, scan-in at the receiving site, and an aging report of open transfers. An inbound transfer is treated like a supplier ASN, so receiving works the same way whether the truck is yours or a vendor’s.

Example (fictional). A distributor with one DC and three branches finds that branch balances for item EX-20118, a case of 12 hose clamps, never agree with what the DC shipped them. Walking the process shows why: transfers are scanned out at the DC, but branches receive them days later by typing a total from the paperwork, and partial receipts get rounded up. The written requirement becomes: “A transfer shipment creates an expected receipt at the destination branch listing each carton’s label ID. The branch receives by scanning. Any carton not scanned within two business days appears on the open-transfer report.” The acceptance test ships a transfer with one carton held back and checks that the carton appears on the report on the third day.

Where to start

Most distribution projects can start with a Scope and plan engagement. We walk receiving, put-away, picking and shipping, gather your trading partners’ EDI guides, list every interface in an integration inventory, and write requirements with acceptance tests. Receiving is a common first build, because it produces the records that counting, picking and invoicing depend on. When the work goes live, your team gets the documentation and training to run it.

Scope your project.

Tell us what you need to track, which systems you run and when it has to work. We reply with questions or a time to talk.